Procedure: Overhanging Floors (Cantilevers)

  1. Expose the underside of the overhang, remove existing insulation (if any), and clean the framing and subfloor.
  2. Install spray foam sealant around all penetrations and joints at the subfloor and rim joist.
  3. Install batt insulation in each joist space and secure it in place with insulation supports.
  4. Re-install the soffit material.