Shall be sealed to maintain the integrity of the air barrier system.
9.25.3.3.(5) Where an interior floor projects through an exterior wall or extends to become an exterior floor, continuity of the air barrier system shall be maintained from the abutting walls across the floor assembly.
9.25.3.3.(6) Penetrations of the air barrier system, such
as those created by the installation of doors, windows, electrical
wiring, electrical boxes, piping and ductwork, shall be sealed to
maintain the integrity of the air barrier system over the
entire surface.