9.25.3.6.(2) Where the floor-on-ground is a concrete slab, the air barrier shall be
a) installed below the slab, or
b) applied to the top of the slab, provided a separate floor is installed over the slab.
9.25.3.6.(3) Where the air barrier installed below a floor-on-ground is flexible sheet material, joints in the barrier shall be lapped not less than 300mm. (12")
9.25.3.6.(4) Where installed in conjunction with a framed floor-on-ground or above a floor-on-ground, the air barrier shall be installed in accordance with Article 9.25.3.3.