The system used will determine
where the air barrier and vapour retarder will be placed in the
envelope systems, and what materials will be used. The air barrier
can always be placed anywhere within the building envelope, but the
vapour retarder must be on the warm side of the building envelope,
which is determined by where the insulation is installed in the
building envelope. Remember that any approach used will require all
control layers to be present.