The exterior weather barrier is
in place and complete
Penetrations through the wall
are sealed at the weather barrier
Studs and plates are free from
rot or other damage
Left over nails from previous
work have been removed from studs
Exterior sheathing is free from
rot or other damage
Any noted structural defects or
electrical issues have been corrected
Ensure any plumbing located in
exterior walls is properly located as close to the interior surface
as possible to allow it to be insulated on the cold side to prevent
freezing