9.18.6.2. |
Ground Cover in Heated Crawl Spaces
- Where a crawl space is heated, a ground cover consisting of not less than 0.15 mm polyethylene sheet conforming to CAN/CGSB-51.34-M, "Vapour Barrier, Polyethylene Sheet for Use in Building Construction," shall be installed as part of an air barrier system in accordance with Subsection 9.25.3.
- The ground cover required in Sentence (1) shall have its joints lapped not less than 300 mm, and
- be sealed and evenly weighted down, or
- be covered with concrete not less than 50 mm thick.
- The perimeter of the ground cover required in Sentence (1) shall be sealed to the foundation wall. (See Notes A-9.13.4., A-9.25.3.4. and 9.25.3.6., and A-9.25.3.6.(2) and (3).)
- All penetrations of the ground cover required in Sentence (1) shall be sealed against air leakage. (See Subsection 9.25.3.)
|