3.3 Job-Site Survey and Pre-Changeout

The first step of a best practice installation of ASHPs includes completing a homeowner interview, evaluating the existing HVAC system and the building enclosure, and gathering other site-related information in order to complete load calculations and design an appropriate ASHP system.