- DO NOT MIX AND MATCH VENTING COMPONENTS AND USE MATERIALS THAT ARE ULC-S636 COMPLIANT
- TERMINATE THE NEW COMBUSTION AIR PIPE ABOVE THE ROOF OR BEYOND AN EXTERIOR WALL
- ENSURE THAT ALL NEW PENETRATIONS ARE MADE WATER AND AIRTIGHT
- PROVIDE ADEQUATE SUPPORT FOR NEW VENTING (HANGERS, BRACKETS, ETC.)
- CONFIRM THAT FURNACE PLACEMENT MEETS THE MANUFACTURER'S REQUIREMENTS
- CONNECT CONDENSATE LINE TO THE BUILDING SANITARY SYSTEM AND INCLUDE A NEW TRAP AS REQUIRED
- USE ACCEPTABLE CONDENSATE LINE MATERIALS FOR THE ROUTE