Key Points
DO NOT MIX AND MATCH VENTING COMPONENTS AND USE MATERIALS THAT ARE
ULC-S636
COMPLIANT
TERMINATE THE NEW COMBUSTION AIR PIPE ABOVE THE ROOF OR BEYOND AN EXTERIOR WALL
ENSURE THAT ALL NEW PENETRATIONS ARE MADE WATER AND AIRTIGHT
PROVIDE ADEQUATE SUPPORT FOR NEW VENTING (HANGERS, BRACKETS, ETC.)
CONFIRM THAT FURNACE PLACEMENT MEETS THE MANUFACTURER'S REQUIREMENTS
CONNECT CONDENSATE LINE TO THE BUILDING SANITARY SYSTEM AND INCLUDE A NEW TRAP AS REQUIRED
USE ACCEPTABLE CONDENSATE LINE MATERIALS FOR THE ROUTE
←